Mountlake Terrace station
View of the platform and north entrance from the parking garage | ||||||||||||||||||||
| General information | ||||||||||||||||||||
| Location | 6001 236th Street Southwest Mountlake Terrace, Washington United States | |||||||||||||||||||
| Coordinates | 47°47′08″N 122°18′53″W / 47.78556°N 122.31472°W | |||||||||||||||||||
| System | Link light rail | |||||||||||||||||||
| Owned by | ||||||||||||||||||||
| Platforms | 1 island platform | |||||||||||||||||||
| Tracks | 2 | |||||||||||||||||||
| Train operators | Sound Transit | |||||||||||||||||||
| Bus routes | 7 | |||||||||||||||||||
| Bus stands | 6 | |||||||||||||||||||
| Bus operators | ||||||||||||||||||||
| Construction | ||||||||||||||||||||
| Structure type | Elevated | |||||||||||||||||||
| Parking | 891 parking spaces[1] | |||||||||||||||||||
| Bicycle facilities | Bicycle lockers and racks | |||||||||||||||||||
| Accessible | Yes | |||||||||||||||||||
| History | ||||||||||||||||||||
| Opened | February 23, 2009 (buses) August 30, 2024 (light rail) | |||||||||||||||||||
| Rebuilt | 2019–2024 | |||||||||||||||||||
| Passengers | ||||||||||||||||||||
| 1,612 daily weekday boardings (2025)[2] 529,958 total boardings (2025)[2] | ||||||||||||||||||||
| Services | ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
Mountlake Terrace station is a light rail and bus station in Mountlake Terrace, Washington, United States. It is served by the 1 Line and 2 Line of Sound Transit's Link light rail system, which connects Snohomish County to Seattle and other areas of King County. The elevated station comprises a single platform, a parking garage and lot with 891 total stalls, and seven bus bays that are served by Community Transit, King County Metro, and Sound Transit Express. The bus station includes two bays in the median of Interstate 5 that are connected to the parking garage by a pedestrian bridge.
The original park-and-ride lot at the site, near Interstate 5 and 236th Street Southwest, was opened by Community Transit in April 1983. It primarily served commuter routes to Downtown Seattle and regularly reached capacity by the following decade. A parking garage and larger transit center opened on February 23, 2009, and the median bus bays on Interstate 5 were completed in March 2011. Plans to build a light rail station at the park-and-ride were approved by voters in the 2008 Sound Transit 2 package as part of the Lynnwood Link Extension. Construction began in 2019 and the station opened on August 30, 2024.
Location
The station straddles 236th Street Southwest on the east side of Interstate 5 in Mountlake Terrace, a city in the Snohomish County on its border with King County. Mountlake Terrace station has a parking garage and bus loop on the north side of 236th Street Southwest. It is southwest of downtown Mountlake Terrace and adjacent to Veterans Memorial Park, which separates the station from the civic center campus.[3][4] The Mountlake Terrace city government began to encourage transit-oriented development around the future station and in their city center as early as 2007 to prepare for population growth.[4]
The former site of the Evergreen Elementary School just south of the station was redeveloped into three residential buildings with 600 apartments and retail spaces. Construction began in 2018 and was completed by 2024 with the buildings connected by a new street, named Van Ry Boulevard.[5][6] A large lot to the east of the station and bus loop, used for construction staging and temporary parking, is planned to have a pair of eight-story buildings with 425 total rental units.[7] The city government adopted plans to develop a "town center" in the older downtown area east of the light rail station in 2019.[8] By 2024, the town center had several new residential buildings as a result of the transit-oriented development plan.[4][9]
History
The first transit facility in Mountlake Terrace was a 400-stall park and ride lot at Interstate 5 and 236th Street Southwest that opened on April 13, 1983. It was constructed by Community Transit to serve two local routes and King County Metro commuter buses to Downtown Seattle. The park and ride, the fourth of its kind in Snohomish County, was partially funded by the Federal Highway Administration and the Washington State Department of Transportation (WSDOT).[10][11] Metro service ceased in June 1989 and was replaced by Community Transit's own commuter routes.[12][13] By 1988, the park and ride lot regularly reached capacity and resulted in commuters' vehicles parked on neighborhood streets.[14][15]
Community Transit began to lease parking lots at three nearby churches to provide overflow capacity for the Mountlake Terrace park and ride in 1991.[15][16] Later in the decade, Community Transit proposed the construction of a parking garage at the lot as part of a program to increase park and ride capacity along the Interstate 5 corridor in Snohomish County.[17] City officials proposed a mixed-use development with housing and retail integrated into the garage, but later dropped those elements from the plans.[15][18] A five-story garage with 652 stalls, an adjoining surface lot, and transit center were approved with a budget of $19.4 million funded primarily by the Federal Transit Administration.[19] Construction began in December 2007 with the closure of the existing lower lot, which was replaced by spaces leased from a local church and grocery store.[18][20] An integrated flyer stop in the median of Interstate 5 was included in plans for the parking garage to allow Sound Transit Express buses to serve Mountlake Terrace.[21]
Mountlake Terrace Transit Center was dedicated on February 20, 2009, and opened three days later with two bays for bus routes.[22][23] The parking garage was built with recycled materials and includes two elevators, 32 solar panels on its façade, and a stream that was daylighted during construction. It also has glass art created by local high school students under the direction of artist Jerry Newcomb.[24][25] The existing surface lot to the east of the bus bays was later refurbished using funding from the American Recovery and Reinvestment Act of 2009.[26] Construction of the freeway flyer stop, named the Mountlake Terrace Freeway Station, began in May 2009 and cost $35.4 million with funding primarily from Sound Transit as part of the regional transit system.[27][28] It opened on March 20, 2011, and served by Sound Transit Express and Community Transit commuter routes connecting Snohomish County to Downtown Seattle.[27] The median flyer stop was first proposed in a 1996 report by Sound Transit and WSDOT to serve buses without leaving the freeway's high-occupancy vehicle lanes.[29]
Light rail planning
A plan for a rapid transit line between Seattle and Everett was published by the Seattle Transit System in 1957 and proposed to use the right-of-way reserved for Interstate 5, which had not been completed. It included Ballinger station, named for Lake Ballinger, at Northeast 205th Street on the King–Snohomish county line to serve Mountlake Terrace.[30] The state government determined that it would be unable to purchase additional right-of-way for a transit project using funding allocated for highway projects, which led to the proposal being shelved.[31][32] The Interstate 5 corridor between Seattle and Lynnwood remained the focus of later transit plans and studies in the 1980s, which proposed to use light rail trains and a station in Mountlake Terrace.[33][34] A 1986 study by Metro Transit and the Puget Sound Council of Governments resulted in an endorsement to build several light rail corridors, among them a Seattle–Lynnwood line with a stop in Mountlake Terrace.[35][36] SNO-TRAN, a county planning agency, recommended stations in the freeway median at 236th Street Southwest and on the west side of the 220th Street Southwest interchange.[37]
The Regional Transit Authority (now Sound Transit) was formed in 1993 to further develop a light rail plan that would be presented to voters for final approval.[38] Although the plan included a light rail line between Seattle and Lynnwood, the Mountlake Terrace city government requested their station be deferred until a final decision on a site could be made. The city council had considered an endorsement of a station near the county line or at 236th Street Southwest, but the latter drew criticism from local residents.[39][40] The transit plan was rejected by voters in March 1995, but a scaled-back version was approved in November 1996 that would leave the northern corridor for a future expansion.[41] Sound Transit adopted long-range plans to extend Link light rail service from Northgate in Seattle to Snohomish County along Interstate 5; the garage and flyer stop at Mountlake Terrace Transit Center were designed to be adapted for potential use by trains.[21][42]
The Seattle–Lynnwood corridor was among the shortlist of projects studied in 2005 by Sound Transit for a future regional transit package, along with further light rail extensions to Everett along either Interstate 5 or State Route 99.[43] One of the studied concepts for the package would have truncated service at Mountlake Terrace, but it was shelved in favor of a Lynnwood terminus.[44][45] The regional ballot measure, named Sound Transit 2, was initially combined with highway projects to form the Roads and Transit ballot measure, which was rejected by voters in November 2007.[46] A transit-only version with fewer projects was approved in November 2008.[47] The Lynnwood Link Extension through Mountlake Terrace and Lynnwood, along either Interstate 5, State Route 99, or 15th Avenue Northeast, was scheduled to open in 2023.[48] The cost of the project was estimated $1.5 billion (in year-of-expenditure dollars) with local funding planned to be raised primarily within Snohomish County.[49][50]
Sound Transit evaluated several routing alternatives, primarily on Interstate 5 and State Route 99, with stations that would serve the existing Mountlake Terrace Transit Center.[51][52] The favored option on State Route 99 would have required two right-angle turns on State Route 104 to reach Mountlake Terrace; other options would have bypassed Mountlake Terrace altogether.[53] The Interstate 5 corridor was chosen by the Sound Transit board of directors for further development and environmental review in December 2011.[54] Four alternatives for Mountlake Terrace station were presented in the draft environmental impact statement, of which three were located east of the parking garage and one utilized the flyer stop in the freeway median.[55] In November 2013, the board of directors chose the eastern station placement option in their preferred alternative for the Lynnwood Link project.[56] The Lynnwood Link route was formally approved in April 2015 with an elevated station that straddles 236th Street Southwest to serve the Mountlake Terrace Transit Center. An option to build a second station in Mountlake Terrace, to the north at 220th Street Southwest, was included if future funding became available.[57][58]
Mountlake Terrace was adopted as the permanent name for the station in July 2017;[59] the other finalist was Ballinger.[60] During final design of the station, the Mountlake Terrace city council threatened to withhold planning approval unless additional parking capacity was provided during construction by Sound Transit.[61] The existing parking facilities at the transit center had regularly reached its full capacity of 890 vehicles by 7:25 a.m. in the morning on weekdays.[62] Sound Transit agreed to build a temporary parking lot adjacent to the transit center but would not permanently expand capacity at the station.[63] A series of design modifications to reduce a $500 million cost overrun for the project were approved in 2018; at Mountlake Terrace station, the exit stairs were narrowed and the decorative masonry was replaced with other materials.[64] The final public hearing for the design of Mountlake Terrace station was held in June 2019.[65] Community Transit transferred ownership of the transit center's parking garage to WSDOT in September 2020;[66] it is planned to be transferred to Sound Transit in 2026 as part of a full acquisition of the station site.[67]
Light rail construction
Construction along the future light rail route through Mountlake Terrace began in early 2019 with the removal of Douglas fir trees that were later replaced by new plantings.[68] The surface parking lot at the transit center was closed in October to prepare for construction staging at the future station. It was replaced by a vacant supermarket in downtown Mountlake Terrace that was leased by Sound Transit to provide 235 parking spaces for up to two years.[69][70] The supermarket lot was served by local Community Transit buses as well as a special shuttle during peak periods.[69] General contractor Skanska was awarded a $778 million contract for the Mountlake Terrace and Lynnwood section of the light rail project in December 2019.[71][72]
Most work was halted in April 2020 during a statewide stay-at-home order during the early stages of the COVID-19 pandemic, but resumed within a few weeks.[73] A five-month closure of the Mountlake Terrace Freeway Station began in July 2020 to create a work zone for the light rail overpass that would cross Interstate 5 north of the station.[74][75] Commuter routes bypassed the flyer stop and a temporary fare-free route to Downtown Seattle was operated by Sound Transit until the stops reopened on November 29.[76]
Construction of the falsework at Mountlake Terrace station began in September 2020 alongside an ancillary building on the east side of the bus bays.[77] The first girders supporting the elevated platform were erected the following month.[78] The main bus bays at the transit center were closed in March 2021 and replaced with a temporary bus loop to the east of the construction site. A cul-de-sac with nine homes was demolished for the temporary facility, which also included a parking lot with 230 stalls.[79] [80] The pouring of concrete foundations for the stairwells, elevators, and escalators at the station began in June 2021.[81] Construction was declared substantially complete in late 2023.[82]
The new main bus loop opened on March 30, 2024.[83] Light rail service on the 1 Line at Mountlake Terrace station began on August 30, 2024.[84] The 2 Line entered simulated service on February 14, 2026, with passengers able to board trains from Lynnwood to International District/Chinatown station.[85]
Station layout
The elevated island platform for Mountlake Terrace station straddles 236th Street Southwest on the east side of its interchange with Interstate 5.[3] The outer sides of the tracks have clear barriers that act as shields from wind and rain.[86] The station has two entrances on opposite sides of 236th Street Southwest: Exit A at the north end, adjacent to bus bays and the parking garage; and Exit B to the south near Van Ry Boulevard. The two entrances include ticket vending machines and rider information at the plaza level and are connected to the elevated platform by stairs, escalators, and elevators; Exit A also has a public restroom.[1] Mountlake Terrace station has 891 total parking stalls in two facilities near the north entrance: a five-story parking garage with 668 stalls to the west and 223 in a surface lot to the east.[1][87]
The station has seven bus bays that serve local and express buses. Three bays are on 236th Street Southwest, two are adjacent to Exit A and the parking garage, and two bays in a flyer stop for express buses are in the median of Interstate 5 at the Mountlake Terrace Freeway Station. The flyer stop is connected to the rest of the complex by a pedestrian bridge to the third floor of the parking garage, which has elevator access.[1][3] Buses that use the local bays continue through a one-way street and layover zone that connects to 236th Street Southwest and Van Ry Boulevard.[1][88] The station has 16 bicycle lockers and 30 racks at its plaza level.[89] A pedestrian path through Veterans Memorial Park, planned to open in 2026, will connect the station to Mountlake Terrace's city hall and library.[90][91]
Mountlake Terrace station was designed by HNTB.[92] It primarily uses earth-toned brown, green, and blue to match with the area's surrounding tree cover.[93] From the station, the light rail tracks continue north and cross over Interstate 5 on a curved bridge that used a mix of precast and cast-in-place concrete.[94][95] As part of Sound Transit's public art program, Kipp Kobayashi was commissioned to create a mural on the metal panels under the platform that hang over the entrances and plazas. The mural, named Re-Forestation, depicts the roots of a large tree using perforations within the metal sheet.[96][97] The Mountlake Terrace Freeway Station has a piece named In The Still Point, which comprises a cast bronze sculpture that resembles a felled tree and a series of tree rings.[27][98]
Services
The station is served by the 1 Line and 2 Line, both part of the Link light rail system. Mountlake Terrace is the first southbound station from Lynnwood City Center and twenty-fourth from Federal Way Downtown, the southern terminus of the 1 Line; Shoreline North/185th station in the next stop to the south. Trains on the 1 Line serve Mountlake Terrace station 20 hours a day on weekdays and Saturdays, from 5:00 a.m. to 12:00 a.m.; and 18 hours on Sundays, from 6:00 a.m. to 12:00 a.m. During regular weekday service, trains operate roughly every eight to ten minutes during rush hour and midday operation, respectively, with longer headways of twelve to fifteen minutes in the early morning and at night. During weekends, 1 Line trains arrive at Mountlake Terrace station every ten minutes during midday hours and every twelve to fifteen minutes during mornings and evenings.[99] The station is approximately 27 minutes from Westlake station in Downtown Seattle and 65 minutes from SeaTac/Airport station.[99]
Mountlake Terrace station is a major hub for bus routes in the city and surrounding areas with local service from Community Transit and King County Metro. The Mountlake Terrace Freeway Station has two bays that are served by Sound Transit Express routes from Downtown Seattle during rush hour.[1][100] During disruptions to Link service, a bus shuttle is operated between stations; it stops at the Mountlake Terrace Freeway Station bays.[1] Community Transit's local routes connect the station to downtown Mountlake Terrace, Aurora Village, Edmonds, Brier, Lynnwood, and Alderwood Mall.[101] An express route connects Mountlake Terrace station directly to Edmonds station and the city's ferry terminal, served by a Washington State Ferries route.[102] King County Metro operates two routes from the station to Shoreline, Lake Forest Park, and Kenmore.[103] The agency also operates its microtransit service, Metro Flex, in a zone that includes Mountlake Terrace station.[104]
References
- ^ a b c d e f g "Stops and stations: Mountlake Terrace Station". Sound Transit. Retrieved December 19, 2025.
- ^ a b "System performance tracker: Link Ridership". Sound Transit. Retrieved February 20, 2026.
- ^ a b c Lindblom, Mike (August 25, 2024). "Lynnwood light rail is opening. Here's what you'll find at 4 new stations". The Seattle Times. Retrieved August 29, 2024.
- ^ a b c Hansen, Jordan (April 20, 2024). "With light rail coming soon, Mountlake Terrace's moment is nearly here". The Everett Herald. Retrieved December 29, 2025.
- ^ Haglund, Noah (May 29, 2018). "Work starting on buildings along I-5 in Mountlake Terrace". The Everett Herald. Retrieved May 29, 2018.
- ^ Deshais, Nicholas (August 25, 2024). "Lynnwood light rail route brings a housing boom". The Seattle Times. Retrieved December 29, 2025.
- ^ "TOD, with 425 apartments, planned for Mountlake Terrace". Seattle Daily Journal of Commerce. May 16, 2024. Retrieved December 29, 2025.
- ^ "City council Sept. 26 set to approve updated Town Center Plan". MLT News. September 24, 2019. Retrieved September 24, 2019.
- ^ McNichols, Joshua (August 30, 2024). "Light rail is helping Mountlake Terrace find its heart". KUOW. Retrieved February 19, 2026.
- ^ Neice, Karl (April 6, 1983). "You can ride CT buses free April 12". The Everett Herald. p. 5A. Retrieved December 29, 2025 – via Newspapers.com.
- ^ "Metro to start new rush hour bus route". The Seattle Times. April 20, 1983. p. F2.
- ^ Bergsman, Jerry (September 21, 1988). "Metro buses won't be traveling to Snohomish County after April". The Seattle Times. p. H5.
- ^ Bergsman, Jerry (June 9, 1989). "Some bus commuters to say goodbye to Metro". The Seattle Times. p. B3.
- ^ Shaw, Linda (May 17, 1988). "Guards considered for park-ride lots". The Seattle Times. p. B3.
- ^ a b c Thompson, Lynn (June 18, 2003). "Officials hope commuter project will jump-start Mountlake Terrace". The Seattle Times. p. H13.
- ^ Aweeka, Charles (October 14, 1991). "U-Pass program's success overcrowds park-and-ride lots". The Seattle Times. p. E1.
- ^ Foster, George (July 24, 1999). "New I-5 park-ride lot may be the last". Seattle Post-Intelligencer. p. B1.
- ^ a b Pesznecker, Scott (December 31, 2007). "Mountlake Terrace parking a hot commodity". The Everett Herald. Retrieved November 29, 2022.
- ^ Halpert, Oscar (February 20, 2009). "MLT Transit Center given rousing welcome". The Enterprise. Retrieved February 24, 2026.
- ^ Sheets, Bill (February 21, 2009). "A roomier park-and-ride". The Everett Herald. p. B1. Retrieved February 22, 2026 – via Newspapers.com.
- ^ a b Pesznecker, Scott (June 22, 2007). "Mountlake Terrace bus trip to get easier". p. B1. Retrieved November 29, 2022.
- ^ "Agency Welcomes 880 New Parking Spaces at Mountlake Terrace Transit Center" (Press release). Community Transit. February 20, 2009. Archived from the original on September 16, 2016. Retrieved July 20, 2016.
- ^ Brown, Charles E. (February 23, 2009). "Bumper to Bumper: License-plate placement". The Seattle Times. p. B1.
- ^ Halpert, Oscar (February 20, 2009). "MLT Transit Center given rousing welcome". The Enterprise. Retrieved September 2, 2024.
- ^ "Transit Parking Changes Coming to Mountlake Terrace" (Press release). Community Transit. February 4, 2009. Archived from the original on August 3, 2009. Retrieved February 24, 2026.
- ^ Cornfield, Jerry (July 18, 2009). "$425,000 to finish transit center". The Everett Herald. p. B1. Retrieved February 22, 2026 – via Newspapers.com.
- ^ a b c "Sound Transit dedicates Mountlake Terrace Freeway Station" (Press release). Sound Transit. March 17, 2011. Retrieved July 20, 2016.
- ^ "Sound Transit to start work on I-5 station at Terrace". The Everett Herald. May 14, 2009. p. B3. Retrieved December 25, 2024 – via Newspapers.com.
- ^ "Puget Sound HOV Pre-Design Studies Digest" (PDF). Washington State Department of Transportation. January 1996. p. 18. Archived from the original (PDF) on July 29, 2018. Retrieved July 28, 2018.
- ^ Anderberg, M. O. (March 1, 1957). Rapid Transit on Freeway, Tacoma–Seattle–Everett (Report). Seattle Transit System. pp. 5–7, 12–13. OCLC 13297486.
- ^ "Hope Dashed On Transit-System Purchase Plan". The Seattle Times. Associated Press. August 1, 1957. p. 13.
- ^ Crowley, Walt (March 5, 1995). "Regional transit: Track to the future". Seattle Post-Intelligencer. p. E1.
- ^ Copeland, Joe (March 21, 1981). "Lynnwood-Seattle commuter rail line touted in study". The Everett Herald. p. 3A. Retrieved February 24, 2026 – via Newspapers.com.
- ^ Bergsman, Jerry (December 18, 1985). "Rail route proposed by transit group". The Seattle Times. p. H1.
- ^ Harden, Mark (March 27, 1986). "Region's mass-transit plan is reaching crossroads". The Everett Herald. p. 1A. Retrieved February 24, 2026 – via Newspapers.com.
- ^ Coughlin, Dan (March 29, 1986). "Rail system by 2020 backed". Seattle Post-Intelligencer. p. D1.
- ^ Koch, Anne (May 18, 1989). "Some oppose light-rail plan". The Seattle Times. p. D2.
- ^ Schaefer, David (October 29, 1994). "Rail system, with buses in suburbs, gets crucial OK". The Seattle Times. p. A9.
- ^ Lobos, Ignacio (December 5, 1994). "Mountlake Terrace still on light-rail fence". The Seattle Times. p. B3.
- ^ "The Regional Transit System Proposal: South King County" (PDF). Central Puget Sound Regional Transit Authority. February 1995. pp. 9–10. Archived from the original (PDF) on September 30, 2015. Retrieved February 24, 2026.
- ^ Schaefer, David (November 6, 1996). "Voters back transit plan on fourth try". The Seattle Times. p. A1. Retrieved February 24, 2026.
- ^ Velush, Lukas (January 23, 2004). "Sound Transit's next move". The Everett Herald. p. A1. Retrieved February 25, 2026 – via Newspapers.com.
- ^ Hadley, Jane (March 26, 2005). "Case made for extending light rail to Everett". Seattle Post-Intelligencer. p. B5. Retrieved March 8, 2026.
- ^ Velush, Lukas (October 19, 2006). "Sound Transit wants rail to Lynnwood". The Everett Herald. p. A1. Retrieved February 26, 2026 – via Newspapers.com.
- ^ Velush, Lukas (April 27, 2007). "Light rail could come here decades sooner". The Everett Herald. p. C1. Retrieved March 8, 2026 – via Newspapers.com.
- ^ Cornfield, Jerry (November 7, 2007). "Roads, rails a 'no' go". The Everett Herald. p. A1. Retrieved February 26, 2026 – via Newspapers.com.
- ^ Lange, Larry (November 5, 2008). "Sound Transit hashing out details". Seattle Post-Intelligencer. p. B1. Retrieved February 26, 2026.
- ^ Sheets, Bill (October 13, 2010). "Light rail to Lynnwood takes another baby step to reality". The Everett Herald. p. A1. Retrieved March 8, 2026 – via Newspapers.com.
- ^ "Appendix A: Detailed Description of Facilities and Estimated Costs" (PDF). Sound Transit 2: A Mass Transit Guide. Sound Transit. July 2008. p. A7. Retrieved February 26, 2026.
- ^ Haglund, Noah (November 27, 2016). "Here's the plan for light rail to Lynnwood, Mountlake Terrace". The Everett Herald. Retrieved November 29, 2022.
- ^ Sheets, Bill (September 19, 2011). "Light rail: On Hwy 99 or I-5?". The Everett Herald. p. A1. Retrieved March 9, 2026 – via Newspapers.com.
- ^ "North Corridor Transit Project Environmental Scoping Information Report" (PDF). Sound Transit. September 2011. p. 17. Archived from the original (PDF) on October 19, 2011. Retrieved March 9, 2026.
- ^ Lindblom, Mike (August 28, 2024). "Why is light rail to Lynnwood opening next to I-5 and not on Aurora?". The Seattle Times. Retrieved September 3, 2024.
- ^ "ST Board narrows focus for North Corridor expansions to light rail options along I-5" (Press release). Sound Transit. December 15, 2011. Retrieved March 9, 2026.
- ^ "Lynnwood Link Extension Draft Environmental Impact Statement" (PDF). Sound Transit. July 2013. p. S-11. Retrieved March 9, 2026.
- ^ "Sound Transit board picks preferred alternative for Lynnwood Link light rail" (Press release). Sound Transit. November 21, 2013. Retrieved March 9, 2026.
- ^ Haglund, Noah (April 23, 2015). "Sound Transit approves light rail route to Lynnwood, Terrace". The Everett Herald. Retrieved March 9, 2026.
- ^ Lindblom, Mike (April 23, 2015). "4 North End light-rail stations get Sound Transit's green light". The Seattle Times. Retrieved June 13, 2015.
- ^ "Permanent station names adopted". Sound Transit. July 28, 2017. Retrieved March 9, 2026.
- ^ Slager, Melissa (March 27, 2017). "Light rail stations in Lynnwood, Mountlake Terrace need names". The Everett Herald. Retrieved March 9, 2026.
- ^ Wippel, Teresa (July 1, 2017). "MLT city council continues to press Sound Transit on light rail station specifics". My MLTNews. Retrieved March 9, 2026.
- ^ Giordano, Lizz (March 29, 2018). "As Puget Sound region grows, park and rides fill up". Crosscut.com. Archived from the original on August 21, 2019. Retrieved March 9, 2026.
- ^ Haglund, Noah (June 23, 2018). "It's getting real: Light rail is coming to the 'burbs". The Everett Herald. Retrieved March 9, 2026.
- ^ Haglund, Noah (June 17, 2018). "Light rail loses some bells and whistles as it inches north". The Everett Herald. Retrieved March 9, 2026.
- ^ Giordano, Lizz (June 26, 2019). "Last chance to comment on Mountlake Terrace light rail plans". The Everett Herald. Retrieved March 9, 2026.
- ^ "Mountlake Terrace Transit Center Parking Garage Changes Ownership". CommunityTimes. Vol. 13, no. 28. Community Transit. October 2, 2020. Retrieved December 19, 2025.
- ^ "Sound Transit Resolution No. R2025-15" (PDF). Sound Transit. July 24, 2025. Retrieved December 19, 2025.
- ^ Lindblom, Mike (April 15, 2019). "Thousands of trees will be removed to make way for light rail to Lynnwood". The Seattle Times. Retrieved March 9, 2026.
- ^ a b Haglund, Noah (September 21, 2019). "Part of MLT Transit Center will close for light-rail work". The Everett Herald. Retrieved September 24, 2019.
- ^ Haglund, Noah (January 11, 2019). "To prep for light rail, Mountlake Terrace parking to change". The Everett Herald. Retrieved March 9, 2026.
- ^ "Skanska inks $778M light rail contract". Seattle Daily Journal of Commerce. December 6, 2019. Retrieved March 10, 2026.
- ^ "Construction now underway on all parking and station structures for Lynnwood Link extension" (Press release). Sound Transit. February 25, 2021. Retrieved March 9, 2026.
- ^ Sexton, Cody (October 22, 2020). "Congressman Larsen gets light rail update in Mountlake Terrace". My MLTNews. Retrieved March 10, 2026.
- ^ "Mountlake Terrace Transit Center Freeway Station to Close until Late November, Effective July 6" (Press release). Community Transit. June 9, 2020. Archived from the original on October 21, 2020. Retrieved August 17, 2020.
- ^ Watanabe, Ben (November 13, 2020). "Southbound I-5 at Mountlake Terrace to close for rail work". The Everett Herald. Retrieved March 10, 2026.
- ^ "MLT Freeway Station to reopen Nov. 29" (Press release). Community Transit. November 16, 2020. Archived from the original on December 23, 2025. Retrieved December 19, 2025.
- ^ "Agency Progress Report, Capital Programs: September 2020" (PDF). Sound Transit. November 4, 2020. p. 40. Retrieved March 10, 2026.
- ^ "Agency Progress Report, Capital Programs: October 2020" (PDF). Sound Transit. December 7, 2020. p. 40. Retrieved March 10, 2026.
- ^ Distelhorst, Luke (April 1, 2021). "New bus loop at the Mountlake Terrace Transit Center". Community Transit Blog. Community Transit. Retrieved February 28, 2022.
- ^ Bhoolsuwan, Patranya (August 6, 2018). "Homeowners in Mountlake Terrace facing evictions due to Sound Transit's light rail extension plans". KIRO 7 News. Retrieved March 9, 2026.
- ^ "Agency Progress Report, Capital Programs: June 2021" (PDF). Sound Transit. August 4, 2021. p. 44. Retrieved March 10, 2026.
- ^ "Skanska transfers Lynnwood Link Extension (L300) trains to Sound Transit for pre-revenue testing moving closer to finish line" (Press release). Skanska. June 12, 2024. Retrieved March 10, 2026.
- ^ "Changes to Bus Service Start March 30". Community Transit. March 2024. Archived from the original on April 8, 2024. Retrieved May 7, 2024.
- ^ Deshais, Nicholas; Lindblom, Mike (August 30, 2024). "New light rail stations draw big crowds for first trips". The Seattle Times. Retrieved August 30, 2024.
- ^ Lindblom, Mike (February 14, 2026). "More light rail trains will boost Seattle-Lynnwood frequency, capacity". The Seattle Times. Retrieved February 20, 2026.
- ^ Covate, Natalie (November 20, 2016). "Happening nearby: Citizens gather for Sound Transit light rail open house". My Edmonds News. Retrieved March 9, 2026.
- ^ Sheets, Bill (September 7, 2009). "Lots of room at Mountlake Terrace park-and-ride". The Everett Herald. Retrieved February 19, 2026.
- ^ "Mountlake Terrace Station Site Plan" (PDF). Sound Transit. November 2016. Retrieved February 24, 2026.
- ^ "Bringing your bike or scooter". Sound Transit. Retrieved February 24, 2026.
- ^ Watanabe, Ben (January 29, 2023). "Paved path, plaza coming to Mountlake Terrace near light rail". The Everett Herald. Retrieved December 28, 2023.
- ^ "Mountlake Terrace project to connect the transit center, Veterans Memorial Park with light rail". KIRO 7 News. March 9, 2025. Retrieved December 29, 2025.
- ^ "Project of the Week: Lynnwood Link Extension". Seattle Daily Journal of Commerce. September 30, 2024. Retrieved February 19, 2026.
- ^ Covate, Natalie (June 19, 2018). "Sound Transit gives light rail update during Mountlake Terrace open house". MyMLTNews. Retrieved February 19, 2026.
- ^ Metzger, Katie (February 28, 2022). "Fresh pics: Light rail crossing I-5". The Platform. Sound Transit. Retrieved February 19, 2026.
- ^ Giordano, Lizz (June 26, 2019). "Last chance to comment on Mountlake Terrace light rail plans". The Everett Herald. Retrieved February 19, 2026.
- ^ Esmeson, Seth Daphne (November 26, 2024). "Mountlake Terrace Station: Forest walks, re-growth, and old haunts". The Platform. Sound Transit. Retrieved December 19, 2025.
- ^ "Sound Transit Art Program (STart) Briefing" (PDF). Seattle Design Commission. March 4, 2021. pp. 77–79. Retrieved February 19, 2026.
- ^ "STart: Sound Transit Art Program interactive map". Sound Transit. Retrieved March 9, 2026.
- ^ a b "1 Line schedule: Lynnwood City Center – Federal Way Downtown" (PDF). Sound Transit. December 2025. Retrieved December 19, 2025.
- ^ Lindblom, Mike (March 8, 2024). "Sound Transit pulls out the stops to solve a Lynnwood train shortage". The Seattle Times. Retrieved December 19, 2025.
- ^ Community Transit System Map (PDF) (Map). Community Transit. August 2025. Retrieved December 19, 2025.
- ^ Deshais, Nicholas (September 3, 2024). "What to know about connecting to the new Lynnwood light rail line". The Seattle Times. Retrieved December 19, 2025.
- ^ Metro Transit System: Northwest Area (Map). King County Metro. September 2025. Retrieved December 19, 2025.
- ^ Porterfield, Elaine (September 19, 2024). "Local, on-demand Metro Flex service now serving the Northshore area". Metro Matters. King County Metro. Retrieved December 19, 2025.