Line 7 (Ningbo Rail Transit)
| Line 7 | |
|---|---|
Line 7 train entering the platform of Qiuga station platform | |
| Overview | |
| Status | Operational |
| Owner | Ningbo Rail Transit Group Co., Ltd |
| Locale | Ningbo, Zhejiang, China |
| Termini |
|
| Stations | 25 |
| Service | |
| Type | Rapid transit |
| System | Ningbo Rail Transit |
| Operator(s) | Ningbo Rail Transit Group Co., Ltd |
| Depot(s) | Xiayingnan depot,[1] Lianqun Parking lot [2] |
| Rolling stock | 6-car type B adopts GoA4 automation level[3] |
| History | |
| Opened | 29 August 2025 |
| Technical | |
| Line length | 39.4 km (24.5 mi) |
| Number of tracks | 2 |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | 1,500 V DC Overhead catenary |
| Operating speed | 100 km/h (62 mph) (Maximum design speed) |
The Line 7 of Ningbo Rail Transit (Chinese: 宁波轨道交通7号线) is a rapid transit line served Ningbo, Zhejiang, China.
The National Development and Reform Commission (NDRC) was aprroved the Ningbo Urban Rail Transit Phase III Construction Plan (2021–2026) plans to construct five projects in 2020: Phase I of Line 6, Line 7; Phase I of Line 8, the western extension of Line 1, and the extension of Line 4. Construction of the first station on Line 7 began on 15 July 2021 and construction of entired line began on 5 January 2022 with total project investment is 33.89 billion RMB.[3][4]
Stations
All 25 stations are underground,[5]
| Station name | Transfer | Distance
km |
Location | ||||
|---|---|---|---|---|---|---|---|
| English | Chinese | ||||||
| Yufan | 俞范 | 0.00 | 0.00 | Zhenhai | |||
| Minghai North Road | 明海北路 | ||||||
| Guisi | 贵驷 | ||||||
| Zhenhai Citizen Square | 镇海市民广场 | ||||||
| Zhenhai Avenue (Cihai) | 镇海大道(慈海) | 5 | |||||
| Luoxing | 骆兴 | ||||||
| Yingjia Road | 应嘉路 | Jiangbei | |||||
| Ningci East Road | 宁慈东路 | ||||||
| Yunfei Road(Kangqiao South) | 云飞路(康桥南) | ||||||
| Wantou | 湾头 | ||||||
| Ningbo Grand Theatre | 宁波大剧院 | 6 | |||||
| Waitan Bridge | 外滩大桥 | 2 | |||||
| Shuguang | 曙光 | Yinzhou | |||||
| Sports Center | 体育馆 | 3 | |||||
| Fumin Park | 福民公园 | ||||||
| Xintian Road | 新天路 | ||||||
| Min'an East Road | 民安东路 | 5 | |||||
| Beimingcheng Road | 北明程路 | ||||||
| Shengmo Road | 盛莫路 | 1 | |||||
| Qiuga | 邱隘 | ||||||
| Shangde Road | 尚德路 | ||||||
| Huilong | 回龙 | ||||||
| Anshi Road | 安石路 | ||||||
| Xiaojiangyang | 小洋江 | 4 | |||||
| Yunlong | 云龙 | 39.4 | |||||
Related Events
From 29 August to 7 September 2025, passengers can receive a free experience ride coupons at any station of Line 7. Each person only received one coupon at a time.[6]
References
- ^ "宁波地铁7号线,开通时间定了!". 28 August 2025.
- ^ "7号线联群停车场开工!这是轨交第三期建设首个场段项目". 13 December 2022.
- ^ a b "宁波地铁7号线 (Ningbo Metro Line 7)".
- ^ "最新消息!宁波地铁6、7、8号线要来了!". 4 January 2021.
- ^ "宁波轨道交通7号线正式开通运营". 1 September 2025.
- ^ "官宣丨如"7"而至!7号线8月29日开通运营,诚邀您体验". 27 August 2025.