Jungbunaeryuk Line

Jungbunaeryuk Line
Overview
StatusOperational
OwnerKorea Rail Network Authority
LocaleGyeonggi
North Chungcheong
North Gyeongsang
Termini
  • Bubal
  • Mungyeong
Stations9
Service
TypeHeavy rail, Passenger/Freight
Regional rail
Operator(s)Korail
Rolling stockKTX-Eum
History
Opened2021-12-31
Technical
Line length94.1 km (58.5 mi)
Number of tracksSingle track
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 60 Hz AC
Operating speed230 km/h (140 mph) (maximum)
Korean name
Hangul
중부내륙선
Hanja
中部內陸線
RRJungbu naeryukseon
MRChungbu naeryuksŏn

The Jungbunaeryuk Line (Korean중부내륙선; lit. 'Middle Inland line') is a rail line partly in operation and partly under construction from Bubal to Mungyeong. Construction started in November 2015. The line opened in December 2021 between Bubal on the Gyeonggang Line & Chungju on the Chungbuk Line.[1] The KTX line was extended in 30 November 2024 from Chungju to Mungyeong. Another extension from Mungyeong to Gimcheon was approved in December 2022.[2]

Rolling stock

Stations

Station name Transfer Distance in km Location
Romanized Hangul Hanja Station distance Total distance
Bubal 부발 夫鉢 Gyeonggang Line
0.0
0.0
Icheon-si
Ami 아미 牙美
2.5
2.5
Ganam 가남 加南
6.5
9.0
Yeoju-si
GamgokJanghowon 감곡장호원 甘谷長湖院
12.2
21.2
Eumseong-gun
Angseongoncheon 앙성온천 仰城溫泉
14.6
35.8
Chungju
Geumga 금가 金加
11.8
47.6
Chungju 충주 忠州 Chungbuk Line
8.7
56.3
Salmi 살미 乷味
10.3
66.6
Suanbooncheon 수안보온천 水安保溫泉
8.5
75.1
Yeonpung 연풍 延豊
6.3
81.4
Goesan-gun
Mungyeong 문경 聞慶 Mungyeong Line
11.3
92.7
Mungyeong

Services

KTX-Eum operate on this line 4 times a day since December 31, 2021.

References

  1. ^ "대선시계와 중부내륙선 철도". Chungbuk Ilbo. 2016-12-18. Retrieved 2017-01-16.
  2. ^ Artymiuk, Simon (2022-12-16). "Approval given for next section of Korea's Middle Inland Line". International Railway Journal. Retrieved 2022-12-27.